<html>
  <head>
    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    Hello All,<br>
    <br>
    The following points that need to be addressed for the RICH
    detector:<br>
    <br>
    <ol>
      <li>Have the bolt size and lift points for the assembly structure
        been determined?</li>
      <li>What is the status of the ASME relief valve approval for the
        cooling system?</li>
      <li>What are the delivery dates for the remaining mirror
        shipments?</li>
      <li>Air compressors:</li>
      <ol type="i">
        <li>George will look into the compressors with the information
          Sandro sent on 6/1/2016. However, I was not able to find the
          exact SF11-8 MC FF model in the brochure linked in the email.</li>
      </ol>
      <li>The space on the Forward Carriage will be measured to ensure
        the compressors and air tank will fit.</li>
      <li>Safety documentation:</li>
      <ol type="i">
        <li>Is the THA correct?</li>
        <li>Who will be writing the Operational Safety Procedure (OSP)
          for the detector?</li>
      </ol>
      <li>Aerogel delivery:</li>
      <ol type="i">
        <li>What are the delivery dates for the remaining aerogel
          shipments?</li>
        <li>Since Valery mentioned that the moisture can be heated out
          of the aerogel, I guess it wouldn't be an issue to store the
          aerogel in the open cleanroom since space is running out in
          the dry boxes.</li>
      </ol>
      <li>What are the delivery dates for the electronics?</li>
      <ol type="i">
        <li> Mindy will help with any hardware work for the assembly of
          the electronic panel and the fabrication of any cabling
          needed.</li>
      </ol>
      <li>The interlocks system and cRIO parts list is attached. Please
        note the pricing and quantity of some items are yet to be
        determined and for those items, a rough cost estimate is
        provided. Also, please note that the list does not account for
        any spare parts.<br>
      </li>
      <li>Interlock system sensors:</li>
      <ol type="i">
        <li>What are the number of variables that need to be monitored?</li>
        <li>What space is available for the sensors within the detector?</li>
        <li>Humidity sensors:</li>
        <ol type="A">
          <li>What precision of measurement is needed? The sensor you
            suggested measures to +/- 1.8 % relative humidity; the
            sensors used to monitor the SVT humidity measure to +/- 3.5%
            relative humidity. Since Valery mentioned the humidity would
            not be a big issue and can be heated out of the aerogel,
            would the SVT sensors be okay?</li>
          <li>How many humidity sensors are needed?</li>
          <li>Where is the placement of the humidity sensors within the
            detector?</li>
        </ol>
        <li>Temperature sensors:</li>
        <ol type="A">
          <li>What is the precision of measurement needed?</li>
          <li>How many temperature sensors are needed?</li>
          <li>Where is the placement of the temperature sensors in the
            detector?</li>
        </ol>
        <li>Air flow sensors:</li>
        <ol type="A">
          <li>What is the precision of measurement needed?</li>
          <li>How many air flow sensors are needed?</li>
          <li>What type of air flow sensors should be used?</li>
          <li>How much space is there available for the sensors inside
            the detector?<br>
          </li>
          <li>Where is the placement of the air flow sensors in the
            detector?</li>
        </ol>
      </ol>
      <li>PCs for testing:</li>
      <ol type="i">
        <li>Amrit informed me on his return that the PCs I have
          previously said that would be available for use would be
          needed soon for other projects (my apologies on the
          miscommunication).</li>
        <li>Are there PCs that could be brought for the testing?</li>
        <li>Who would buy the PCs and monitors if they need to be
          bought?</li>
      </ol>
      <li>The PCs for the mirror testing would have to go on the guest
        network.</li>
      <ol type="i">
        <li>Is the guest network okay?</li>
        <li>Is a network connection even needed for the tests?</li>
      </ol>
      <li>What is the status on the gas systems?</li>
    </ol>
    <p>In addition to the above points, the interlock system is being
      developed and the specifications will be authored by Amanda for
      distribution. For the interlock system, the number of variables to
      be monitored, the alarms that will be set, and the trip levels
      will need to be determined.<br>
    </p>
    <p>Sincerely,<br>
      Tyler<br>
    </p>
  </body>
</html>