Walt,<br>
<br>
Volker pointed out I did not put date for installation, sorry.<br>
Drift chambers will be installed by October.<br>
<br>
Stepan<br>
<br>
<div class="moz-cite-prefix">On 7/22/16 10:27 AM, Stepan Stepanyan
wrote:<br>
</div>
<blockquote cite="mid:44c3ddf6-95b4-a71f-9c73-8741c72bcf4f@jlab.org"
type="cite">
<meta content="text/html; charset=windows-1252"
http-equiv="Content-Type">
Dear Walt,<br>
<br>
According to our current schedule CLAS12 drift chambers that
occupy most of space in the <br>
clean room must be installed in the hall. The only thing will be
remain there is SVT. SVT does <br>
not take much space and it can be moved around if needed. <br>
<br>
Regards, Stepan <br>
<br>
<div class="moz-cite-prefix">On 7/21/16 3:58 PM, Walt Akers / JLAB
wrote:<br>
</div>
<blockquote cite="mid:5791296A.6060000@jlab.org" type="cite">
<meta content="text/html; charset=windows-1252"
http-equiv="Content-Type">
Dear Volker, Stepan and Mac:<br>
<br>
As Marco mentions below, we are approaching the time for the <br>
RICH detector work to begin in EEL 124. I've included an excerpt<br>
from the work plan here.<br>
<br>
<blockquote><b>RICH detector assembly October 2016 to July 2017</b><br>
The assembly of the detector will begin in the EEL-124 clean
room in October<br>
2016. The project team has requested an area of 36’ x 36’.
This large area is<br>
required also to perform the alignment of the mirrors inside
the detector. The area<br>
must be quipped with a 2 ton crane capacity and possibly a
forklift for the<br>
movement and installation of the various components.<br>
The assembly of the RICH will be performed by using a special
mechanical<br>
structure, anchored on the floor, on which the various
components will be<br>
mounted. The assembly structure is equipped with a winch to
rotate the RICH<br>
from the vertical assembly position to the horizontal one
ready for the<br>
transportation inside the Hall B.<br>
The assembly procedures will also include the check of the
alignment of the<br>
mirrors once they are installed and the survey of the RICH
module. For these<br>
operations, the support of the JLab survey group is requested.<br>
</blockquote>
<br>
Are your folks nearing completion of their work in the room and
how<br>
soon might it be available for the RICH folks to begin?<br>
<br>
Thanks,<br>
<br>
Walt<br>
<br>
<br>
<div class="moz-cite-prefix">Marco Mirazita wrote:<br>
</div>
<blockquote
cite="mid:9b1678da5ad8c04ac730b5daa84a041c@webmail.lnf.infn.it"
type="cite">Dear Walt, <br>
even if with some delay, the construction of the RICH is
almost done and we should be able to ship by sea during this
summer. <br>
It means that most likely in September all the material should
be stored in the CMSA. <br>
According to the last RICH installation plan we discussed, the
assembly work should start in October. Could you please
confirm that the area we need in the EEL124 clean room will be
made free? <br>
Thanks, <br>
Marco <br>
<br>
</blockquote>
<br>
</blockquote>
<br>
</blockquote>
<br>
</body>
</html>