<html><head><meta http-equiv="Content-Type" content="text/html charset=utf-8"></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space;" class=""><div class=""><br class=""></div><div class="">Hi Tyler,</div><div class=""><br class=""></div><div class="">thank you for the table, I attach a pdf with some comments.</div><div class=""><br class=""></div><div class="">Please note that VXS and Fiber distribution (11 + 4 U) is adequate for two RICH. </div><div class=""><br class=""></div><div class="">About location:</div><div class="">We would prefer to have the fibers distribution box above the VXS crate.</div><div class="">If you have a 3D view of the rack and equipment that would be great to show details and optimize space but still allow for maintenance/access. (maybe fibers distribution can fit on the back of VXS saving 4U...)</div><div class=""><br class=""></div><div class="">At the moment we don’t know if one CAEN crate (power supply) will be enough for two sector,</div><div class="">we might consider to fill one rack with readout and gas control system and the other dedicated to (expandable) power supply crate(s).</div><div class=""><br class=""></div><div class="">Matteo</div><div class=""><br class=""></div><div class=""> </div><div class=""></div></body></html>