Folks; In the minutes, I said that the plan to 'kill' areas of the detector with a gemc post-processor was a good one. However, for wires that are only partially dead or were only dead for part of the run period it is important that GPP be applied to BOTH the simulated and real data. - Mac "mestayer at jlab.org", (757)-269-7252