Logentry Text:
--
4 Sept
1300 Change to calibration target. Pictures and drawing in log book.
Take one-hour calibration run. See pattern in rastermon
1530 install empty target, then access to add heater tape to unfreeze run valve
PSS door malfunction costs 4 hours beam
2115 increase raster pattern to max. x increased to 3.8 V, y unchanged at 3.25. Limited by FSD halo trips
2230 turn off magnets to take zero field straight track runs
5 Sept
missing operator scare. Might have lost 4 hours beam. Operator found. Phew!
Plan:
Take zero field data until 1300
then take 2 hour magnet-on, raster-off alignment run
Change to C target at 1630 after MCC shift change
** RC meeting at 1515 today to discuss polarized target plans for the next two days **
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4038052
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/clas_members/attachments/20220905/8b627aca/attachment.html>
More information about the clas_members
mailing list