<html><body><div style="font-family: arial,helvetica,sans-serif; font-size: 12pt; color: #000000"><div>Dear collaborators,</div><div><br data-mce-bogus="1"></div><div>As you know we have to demonstrate Key Performance Parameters (KPP) of CLAS12 with the beam.</div><div>The KPP run is scheduled for February 3-16. We need to staff shifts for this period. Even though most of the work will be handled by the system exerts we still need regular shifts in the counting house. As usual there will be three 8-hour shift a day with two people per shift.  At this time we are calling for volunteers. The schedule may change therefore we are counting more on people who don't need to travel from afar.  Those who took shifts for HPS or PRad are especially encouraged.</div><div>We have have all relevant information for this run on the web https://www.jlab.org/Hall-B/run-web/</div><div>You can find all run relevant documents which among other things outline safety and required training.</div><div>Stepan will serve as the Run Coordinator for this run and I will be the PDL.</div><div><br data-mce-bogus="1"></div><div>If you are available and willing to take shifts during this period please send Stepan and me email with your availability.</div><div><br></div><div>Thanks,</div><div><br></div><div data-marker="__SIG_PRE__">-Eugene</div></div></body></html>