<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
</head>
<body style="word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;" class="">
Hello everyone, 
<div class=""><br class="">
</div>
<div class="">
<div>
<div style="color: rgb(14, 16, 26); margin-top: 0pt; margin-bottom: 0pt;" class="">
<span data-preserver-spaces="true" style="margin-top: 0pt; margin-bottom: 0pt;" class="">Based on the log entry made 10 min ago, </span><a target="_blank" href="https://logbooks.jlab.org/entry/4272288" class="editor-rtfLink" style="margin-top: 0pt; margin-bottom: 0pt; color: rgb(74, 110, 224);"><span data-preserver-spaces="true" style="margin-top: 0pt; margin-bottom: 0pt;" class="">https://logbooks.jlab.org/entry/4272288</span></a><span data-preserver-spaces="true" style="margin-top: 0pt; margin-bottom: 0pt;" class="">,
 the current estimate for locking up the machine is 3 pm. At this point, it is unrealistic to expect any beam to be sent to halls before midnight. I will update you later in the afternoon on the progress. </span></div>
<div style="color: rgb(14, 16, 26); margin-top: 0pt; margin-bottom: 0pt;" class="">
<span data-preserver-spaces="true" style="margin-top: 0pt; margin-bottom: 0pt;" class=""><br class="">
</span></div>
<div style="color: rgb(14, 16, 26); margin-top: 0pt; margin-bottom: 0pt;" class="">
<span data-preserver-spaces="true" style="margin-top: 0pt; margin-bottom: 0pt;" class="">Regards, Stepan</span></div>
<div style="color: rgb(14, 16, 26); margin-top: 0pt; margin-bottom: 0pt;" class="">
<span data-preserver-spaces="true" style="margin-top: 0pt; margin-bottom: 0pt;" class=""><br class="">
</span></div>
<blockquote type="cite" class="">
<div class="">On Mar 31, 2024, at 9:20 AM, Stepan Stepanyan <<a href="mailto:stepanya@jlab.org" class="">stepanya@jlab.org</a>> wrote:</div>
<br class="Apple-interchange-newline">
<div class="">
<div class=""><br class="">
Dear all,<br class="">
<br class="">
We just had a PD/RC meeting; the good news is the spreader magnet with the new vacuum chamber is in place, the initial survey and alignment are done, vacuum connections are done, and pumping has started. The results of the pumping startup are encouraging. But
 there is still no ETA for the beam to the halls. Definitely, there will be no beam during the day shift as another survey and alignment and more pumping with ion pumps must go on. Only after that operation will start the restoration of the machine.<br class="">
<br class="">
Regards, Stepan<br class="">
RC<br class="">
<br class="">
</div>
</div>
</blockquote>
</div>
<br class="">
</div>
</body>
</html>