<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=utf-8">
</head>
<body bgcolor="#FFFFFF" text="#000000">
<span style="font-size:12.0pt;font-family:"Times New
Roman";
mso-fareast-font-family:"Times New
Roman";mso-bidi-font-family:"Times New Roman";
mso-ansi-language:EN-US;mso-fareast-language:AR-SA;mso-bidi-language:AR-SA">The
accelerator
operations schedule through December 22, 2015 at 8 AM has been
posted at:<br>
</span><a
href="http://www.jlab.org/div_dept/physics_division/experiments/schedule.html"><font
class="Apple-style-span" color="#144fae" face="'Times New
Roman'"><span class="Apple-style-span" style="font-size: 16px;"><u>http://www.jlab.org/div_dept/physics_division/experiments/schedule.html</u></span></font></a>
<div><br>
</div>
<span style="font-size:12.0pt;font-family:"Times New
Roman";
mso-fareast-font-family:"Times New
Roman";mso-bidi-font-family:"Times New Roman";
mso-ansi-language:EN-US;mso-fareast-language:AR-SA;mso-bidi-language:AR-SA">This
schedule
covers the first experiment run period of the “12 GeV Era’’ to be
executed in parallel with the Accelerator Commissioning and
Development necessary
to bring the machine to its design performance and meet the 12 GeV
JLab upgrade project
goals.</span>
</body>
</html>