<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <div>The accelerator operations schedule through December 2018 has
      been posted at:<br>
    </div>
    <div><a class="zUrl" target="_blank"
href="http://www.jlab.org/div_dept/physics_division/experiments/schedule.html"
data-mce-href="http://www.jlab.org/div_dept/physics_division/experiments/schedule.html"
        moz-do-not-send="true">http://www.jlab.org/div_dept/physics_division/experiments/schedule.html</a><br>
      <div><br>
      </div>
      This is the first beam schedule with all halls operational after
      having completed their 12 GeV construction. We expect Hall A to
      carry out a series of experiments involving the 3H nuclei, Hall B
      to perform an Engineering Run followed by Run Group A and, Hall C
      to perform optics calibration of the Super-High Momentum
      Spectrometer (SHMS) followed by the commissioning group of
      experiments. Hall D is expected to complete the first GlueX
      experiment.<br>
      <div><br>
      </div>
      - The Experiment Scheduling Committee</div>
  </body>
</html>