[Dlsupport] task list 06/28/2016
David Douglas
douglas at jlab.org
Mon Jul 11 14:55:39 EDT 2016
Which direction is the observer looking... at the direction from which
the beam comes, or in the direction of beam motion?
Thanks!
On 7/11/2016 2:54 PM, Stephen Benson wrote:
> Just for information sake, the skew quads are rotated 45 degrees
> counterclockwise from their normal quad orientation.
>
> Steve
>
> On Jul 6, 2016, at 8:49 PM, David Douglas <douglas at jlab.org
> <mailto:douglas at jlab.org>> wrote:
>
>> oops... one other remark: in principle, the "parity" will be defined
>> by the rotation angle of the skew quad, which is either +45 degrees
>> or -45 degrees, looking either up-beam or down-beam... which
>> translates into either positive or negative skew quad when a positive
>> (horizontally focusing) normal quad is rotated.
>>
>> So, there are only 8 possible combinations for any particular code... ;)
>>
>>
>>
>> On 7/6/2016 10:59 AM, Michele Joyce wrote:
>>> Should this info be kept and maintained in the LED?
>>> Michele
>>>
>>> On 7/5/2016 12:26 PM, David Douglas wrote:
>>>>
>>>> Thanks Jim.
>>>>
>>>> Part of the need for the polarity check is to establish the
>>>> "parity" of the skews (which differs between EPICS and codes). I
>>>> don't want to introduce bias, but if we could measure the poletip
>>>> field (with sign) of each quad and log it, we'll save time overall.
>>>> I'll sketch up a procedure.
>>>>
>>>> Thanks
>>>>
>>>> D
>>>>
>>>>
>>>> On 7/5/2016 11:00 AM, Jim Coleman wrote:
>>>>> Hi Dave,
>>>>> We haven't powered any of the 4F quads yet. That will not happen
>>>>> until the spool pieces are installed due to splitting of the
>>>>> magnet. We have to perform a voltage/ current/ polarity
>>>>> measurement of any magnet as part of the HCO. I'll make sure LCW
>>>>> gets put on the skews.
>>>>> -Jim
>>>>>
>>>>> On 7/5/2016 10:08 AM, David Douglas wrote:
>>>>>>
>>>>>> re: #2) - please put the results of the test into the LERFLog. Thanks
>>>>>>
>>>>>> D
>>>>>>
>>>>>>
>>>>>> On 7/5/2016 10:07 AM, David Douglas wrote:
>>>>>>>
>>>>>>> Hi Jim - don't know if the following was communicated to you or
>>>>>>> not, but
>>>>>>>
>>>>>>> 1) Steve asked if the 10 additional skew quads needed water
>>>>>>> cooling. Answer: if the other quads are run with water cooling,
>>>>>>> these will need it as well. They run at the same fields as the
>>>>>>> normal quads.
>>>>>>>
>>>>>>> 2) Has each quad been polarity checked (i.e. a Hall probe put on
>>>>>>> each pole of each quad)? We need to be sure there are consistent
>>>>>>> sign conventions through 4F, and I'll need to know what pole of
>>>>>>> each quad is at what sign and field level when the usual +5A
>>>>>>> test current is being run.
>>>>>>>
>>>>>>> Thanks,
>>>>>>> DD
>>>>>>>
>>>>>>>
>>>>>>> On 6/30/2016 4:32 PM, Jim Coleman wrote:
>>>>>>>> apologies for sending it out late
>>>>>>>>
>>>>>>>>
>>>>>>>>
>>>>>>>> _______________________________________________
>>>>>>>> Dlsupport mailing list
>>>>>>>> Dlsupport at jlab.org
>>>>>>>> https://mailman.jlab.org/mailman/listinfo/dlsupport
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>> _______________________________________________
>>>>>>> Dlsupport mailing list
>>>>>>> Dlsupport at jlab.org
>>>>>>> https://mailman.jlab.org/mailman/listinfo/dlsupport
>>>>>>
>>>>>
>>>>
>>>>
>>>>
>>>> _______________________________________________
>>>> Dlsupport mailing list
>>>> Dlsupport at jlab.org
>>>> https://mailman.jlab.org/mailman/listinfo/dlsupport
>>>
>>>
>>>
>>> _______________________________________________
>>> Dlsupport mailing list
>>> Dlsupport at jlab.org
>>> https://mailman.jlab.org/mailman/listinfo/dlsupport
>>
>> _______________________________________________
>> Dlsupport mailing list
>> Dlsupport at jlab.org <mailto:Dlsupport at jlab.org>
>> https://mailman.jlab.org/mailman/listinfo/dlsupport
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dlsupport/attachments/20160711/cb3fef12/attachment.html>
More information about the Dlsupport
mailing list