[Dlsupport] Questions for the detector installations
Keith Cole
colek at jlab.org
Mon Jul 25 13:08:58 EDT 2016
Steve,
The LDR viewer is using controls for ITV4F06 & ITV4F06A, we would like to use ITV4F04B controls for the OTR.
----- Original Message -----
From: "Stephen Benson" <felman at jlab.org>
To: "Omar Garza" <garza at jlab.org>
Cc: "darklight" <darklight at mit.edu>, dlsupport at jlab.org
Sent: Monday, July 25, 2016 11:45:28 AM
Subject: Re: [Dlsupport] Questions for the detector installations
Oops, I meant viewer, not valve. ITV4F06A.
Steve
On Jul 25, 2016, at 11:41 AM, Stephen Benson < felman at jlab.org > wrote:
MIT is providing all the instrumentation for the gas handling system. They will be providing PVs for monitoring purposes but not for control.
The only think we might need on the Moeller dump is a thermal probe. At this point it is not called out but, if we have vacuum problems that look like heating, we might have to add a couple.
There is only valve that was not available in time for the engineering run that I hope we can get in for the target run. It is just upstream of the Moeller dump and is in the nomenclature but it is masked during the engineering run. It will be a standard OTR viewer with standard controls. I don’t know of any other instrumentation that the DarkLight project might need.
Steve Benson
On Jul 25, 2016, at 11:17 AM, Omar Garza < garza at jlab.org > wrote:
Addition questions from The JLAB I&C Group.
Does the gas handling system require additional instrumentation from the I&C?
Does the moeller dump require any/or additional instrumentation from the I&C?
Are there any additional sensors, instrumentation, controls, that may require our assistance?
Thanks.
Omar
On 7/25/2016 9:49 AM, Stephen Benson wrote:
Here are questions that Anthony DiPette had for the installation:
Who is doing the installation work for the Dark Light Exp. In the LERF 4F Sub 3 region.
MIT staff, JLab INST Group, other?
If JLab INST Group we will need the following questions answered: -
Which ASME Code do we work to, a single one, fluid based or system i.e: - LCW, Air, etc.
Mechanical drawings: -
Are we field engineering based on a marked up P&ID? Minimally need something showing approved size & matl to be used?
Are we getting Mechanical drawings showing approved fabrication details?
Some Combination of 1 & 2?
Materials: -
Are they on order, awaiting delivery, status, etc?
Do we need to order material’s, if so what kind of documentation does the code require?
Is there a list detailing what needs to ordered and quantity?
Who is responsible for procurement’s & documentation?
What project code do we use? LERFDL, LERFMT,????
Are there any “Controlled Materials” needing controlled storage?
Is there any welding involved? If so what procedure does the welder need to be qualified to?
Pressure System Documentation: -
What is required?
Who will generate and maintain it?
What testing is required?
Who will do the QA/QC, inspections?
Feedback is desired for these items.
Steve Benson
_______________________________________________
Dlsupport mailing list Dlsupport at jlab.org https://mailman.jlab.org/mailman/listinfo/dlsupport
<garza.vcf>
_______________________________________________
Dlsupport mailing list
Dlsupport at jlab.org
https://mailman.jlab.org/mailman/listinfo/dlsupport
_______________________________________________
Dlsupport mailing list
Dlsupport at jlab.org
https://mailman.jlab.org/mailman/listinfo/dlsupport
--
Keith Cole
EESICS
Thomas Jefferson National Accelerator Facility
600 Kelvin Drive
Suite 2
Newport News VA 23606
Phone 757-269-5920
More information about the Dlsupport
mailing list