<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=Windows-1252">
</head>
<body>
<div dir="ltr">
<div></div>
<div>
<div>Hi Tyler, </div>
<div dir="ltr"><br>
</div>
<div dir="ltr">The 1T AC is here. I talked to Walt and he said an exhaust port (maybe 6” round) needs to be cut into the wall or ceiling to duct out the heat. Additionally, a fresh air intake will need to be installed. </div>
<div dir="ltr"><br>
</div>
<div dir="ltr">Once these decisions are made and holes are done facilities management will need to install a drain line. </div>
<div dir="ltr"><br>
</div>
<div dir="ltr">I suggest having a meeting between the DIRC group and facilities management come out and decide where all the holes need to go. </div>
<div dir="ltr"><br>
</div>
<div dir="ltr">Also they should consider an exhaust hole for the heat coming from the laser equipment. </div>
<div dir="ltr">
<div><br>
</div>
</div>
<div id="ms-outlook-mobile-signature" dir="ltr">Marc</div>
</div>
</div>
</body>
</html>