good work dsg (dependable and simply good)
From: Dsg-halla_ecal <dsg-halla_ecal-bounces at jlab.org> on behalf of Patrizia Rossi <rossi at jlab.org>
Sent: Wednesday, May 4, 2022 1:52 PM
To: Marc Mcmullen <mcmullen at jlab.org>; dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Subject: Re: [Dsg-halla_ecal] Completion of eCal Supermodule assembly project
Thank you Marc for sharing this great news with the pictures.
Congratulations on the well done job!
patrizia
-------------------------------------------
# Patrizia Rossi
# Jefferson Lab
# 12000 Jefferson Avenue
# Suite 5
# Newport News VA 23606 (USA)
# e-mail: rossi at jlab.org<mailto:rossi at jlab.org>
# phone: +1 (757) 269 7740
# fax: + 1 (757) 269 5800
From: Marc Mcmullen <mcmullen at jlab.org>
Date: Wednesday, May 4, 2022 at 12:30 PM
To: dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Cc: Patrizia Rossi <rossi at jlab.org>
Subject: Completion of eCal Supermodule assembly project
Hi Bogdan and Albert,
DSG has just assembled the last Supermodule for the eCAL detector. Since January, Mindy Leffel, George Jacobs, and I have assembled 59 modules. These modules, along with the balance assembled previously by the other members of DSG, completes the eCAL Supermodule assembly project.
[cid:image004.png at 01D85FD8.50345050]
In addition to assembling the detector components, DSG conducted an inventory of all parts and completed modules to ensure the correct number of short and long modules were assembled. The total module count is 192, with 96 short and 96 long modules.
[cid:22910b4d-6e0c-4204-8a9d-efa66a33fd74]
All but 18 of the 192 modules are located in EEL 126 on the heavy duty shelving units. Albert has 18 modules in testing.
[cid:c11bd11b-2f25-46b3-8829-09a2316c9381]
Regard,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20220504/607264d4/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-3nbrucs5
Type: application/octet-stream
Size: 338006 bytes
Desc: Outlook-3nbrucs5
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20220504/607264d4/attachment-0002.obj>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-py3lnktb
Type: application/octet-stream
Size: 337899 bytes
Desc: Outlook-py3lnktb
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20220504/607264d4/attachment-0003.obj>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 0674338EA05D459FB7773A2074CDF8D7.png
Type: image/png
Size: 159 bytes
Desc: 0674338EA05D459FB7773A2074CDF8D7.png
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20220504/607264d4/attachment-0002.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 95D34DE542B24697B468B9FDAF4F8774.png
Type: image/png
Size: 700626 bytes
Desc: 95D34DE542B24697B468B9FDAF4F8774.png
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20220504/607264d4/attachment-0003.png>
More information about the Dsg-halla_ecal
mailing list