[Dsg-halla_ecal] ECal test stand
Marc Mcmullen
mcmullen at jlab.org
Mon Aug 14 13:54:01 EDT 2023
Hi Don,
I have a meeting to attend, but here is a plot of the current temperatures if you wanted to make an adjustment at the test stand.
Marc
________________________________
From: Dsg-halla_ecal <dsg-halla_ecal-bounces at jlab.org> on behalf of Marc Mcmullen via Dsg-halla_ecal <dsg-halla_ecal at jlab.org>
Sent: Monday, August 14, 2023 10:08 AM
To: dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Subject: [Dsg-halla_ecal] ECal test stand
Hi Don,
Are you available to go to the test stand this morning. If so we should test the system at operational temperatures (enough to get the crystal fronts to 220C).
I will be on vacation starting Tuesday afternoon. During my absence contact Brian Eng or Tyler Lemon if there is an issue with the controls.
During the testing phase, the system should not be run without someone monitoring it. The test station has the controls running on the local monitor.
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230814/398bd62f/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: ECal heater controls-081423.jpg
Type: image/jpeg
Size: 184261 bytes
Desc: ECal heater controls-081423.jpg
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230814/398bd62f/attachment-0001.jpg>
More information about the Dsg-halla_ecal
mailing list