Hi All,
The ECal test stand was moved to Hall A on Friday. Hall A is working on providing network for the control system.
When the network is available, I will relocate the cRIO and Omega to the hall and reconnect the controls.
I will update the mailing list when the system has been reconnected.
Currently, the system is running in the Physics storage using a Real-Time application. The system was started on 9/1 around 3pm and has not crashed.
Regards,
Marc
________________________________
From: Marc Mcmullen
Sent: Friday, September 1, 2023 7:31 AM
To: dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Cc: Ellen Becker <ebecker at jlab.org>; Holly Szumila-Vance <hszumila at jlab.org>; Zachary Remele <remele at jlab.org>
Subject: ECal six-supermodule test stand controls
Hi,
The six-supermodule test stand is being moved sometime today.
I will start the process of moving the controls equipment. This includes the cRIO, Omega, and the over-temperature relay box. These 3 items will be located with the power supplies, in the shielded bunker.
I have requested information on the available of network for the cRIO in the hall and process variables on the IOC.
Regards,
Marc
Get Outlook for iOS<https://aka.ms/o0ukef>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230905/e977a484/attachment.html>
More information about the Dsg-halla_ecal
mailing list