The ECAL six-supermodule controls equipment has been installed in the counting house (NI-9045 cRIO controller) and hall (NI-9149 cRIO expansion chassis). A successful readback test of one of the thermocouple modules channels of the expansion chassis was done to verify that there is communication between the controller and expansion chassis on the hall a network.
Next week the controls software will be migrated to the controller and tested to ensure the controls and monitoring are operating as planned.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4250189