Logentry Text:
--
DSG has replaced the power strip in the ECAL controls rack with a standard power strip (not network enabled). Resetting the ECAL expansion chassis is done by cycling a Lowell AC relay. The Lowell unit supplies 120V AC power, but can be toggled on and off remotely via EPICS. The PV is ECAL_powerStrip. Setting the PV to 0 will turn off all the expansion chassis for the ECAL heater controls, setting the PV to 1 turns all the expansion chassis back on.

It takes some time (2 to 3 minutes) for the signals to return. Also make sure the Main relay is on (green).

The Lowell relay is located on the floor near the large blue Bertha AC supply. 



---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4399892
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20250617/ee2aa629/attachment.htm>


More information about the Dsg-halla_ecal mailing list