[Dsg-halla_gas] Prototype Gas Distribution System

Marc Mcmullen mcmullen at jlab.org
Tue Dec 8 09:23:22 EST 2020


Thanks Kondo
________________________________
From: Gnanvo, Kondo (kg6cq) <kg6cq at virginia.edu>
Sent: Tuesday, December 8, 2020 9:20 AM
To: Marc Mcmullen <mcmullen at jlab.org>; dsg-halla_gas at jlab.org <dsg-halla_gas at jlab.org>
Cc: nilanga at virginia.edu <nilanga at virginia.edu>
Subject: [EXTERNAL] Re: Prototype Gas Distribution System

Hi Marc,
Thanks for the update.
We are also moving the GEM layer to TEDF on Wednesday (tomorrow). After that, I anticipate that it will take a few days to have it completely installed in the bigbite frame (cabling etc ...) and in the meantime, I will arrange with Chuck for the rack and the gas system.
I will keep you informed
Best regards
Kondo
________________________________
From: Marc Mcmullen <mcmullen at jlab.org>
Sent: Monday, December 7, 2020 3:53 PM
To: dsg-halla_gas at jlab.org <dsg-halla_gas at jlab.org>; Gnanvo, Kondo (kg6cq) <kg6cq at virginia.edu>
Subject: Prototype Gas Distribution System

Hi Kondo,

DSG is in the process of finalizing the prototype gas system for use in the TEDF. By Wednesday, all components of the Gas Distribution system will be mounted in the rack in EEL 125. At that time we will inform everyone through this mailing list that the rack is ready to be moved to the test location.

At that point the Hall A/UVA contingent should make arrangements to have the rack moved to the test location. Bulk 1/4" gas line will also be left in that area to connect the system to the GEM under test. DSG can provide remote support to connect the gas lines.

After the rack has been moved, please notify me via this mailing list and I will arrange to come and connect the Gas Flow Readback system (Raspberry Pi with software) on the system and test it for functionality. Once this is complete, I will notify everyone of the status.

Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_gas/attachments/20201208/ce7fcabc/attachment.html>


More information about the Dsg-halla_gas mailing list