[Dsg-halla_gem] [EXTERNAL] Re: SBS testing and assembly in EEL 124

Marc Mcmullen mcmullen at jlab.org
Fri Apr 23 18:12:45 EDT 2021


Thanks Kondo

Marc
________________________________
From: kagnanvo at jlab.org <kagnanvo at jlab.org>
Sent: Friday, April 23, 2021 5:36 PM
To: Marc Mcmullen <mcmullen at jlab.org>
Cc: Brad Sawatzky <brads at jlab.org>; dsg-halla_gem at jlab.org <dsg-halla_gem at jlab.org>; dsg-hallb_rich at jlab.org <dsg-hallb_rich at jlab.org>; Patrizia Rossi <rossi at jlab.org>; Kondo Gnanvo <kagnanvo at jlab.org>; Nilanga Liyanage <nilanga at jlab.org>
Subject: RE: [EXTERNAL] Re: [Dsg-halla_gem] SBS testing and assembly in EEL 124

Hi Marc,
Yes, it is absolutely our intention to be done with the SBS GEMs and
cleanup of the area by end of July.
Only a major unforeseen disaster would keep us around by that time
Best regards
Kondo

> Thanks Brad
>
> Regards,
> Marc McMullen
> Sr. Instrumentation Designer
> Detector Support Group
> (757) 269-7738
>
> From: Brad Sawatzky<mailto:brads at jlab.org>
> Sent: Friday, April 23, 2021 11:16 AM
> To: Marc Mcmullen<mailto:mcmullen at jlab.org>
> Cc: dsg-halla_gem at jlab.org<mailto:dsg-halla_gem at jlab.org>;
> dsg-hallb_rich at jlab.org<mailto:dsg-hallb_rich at jlab.org>; Patrizia
> Rossi<mailto:rossi at jlab.org>; Kondo Gnanvo<mailto:kagnanvo at jlab.org>;
> Nilanga Liyanage<mailto:nilanga at jlab.org>
> Subject: [EXTERNAL] Re: [Dsg-halla_gem] SBS testing and assembly in EEL
> 124
>
> Hi Marc,
>
> Getting out by July 30 should be fine.  I'm CC'ing the GEM group
> leads (Kondo and Nilanga) as well.
>
> Baring some serious unforeseen problem (that would impact the upcoming
> SBS program), all the hardware should be in the Hall by that point.
>
> -- Brad
>
> On Fri, 23 Apr 2021, Marc Mcmullen wrote:
>
>> Hi Brad,
>>
>> During our last meeting we discussed the timeline for the completion of
>> the
>> SBS GEM assembly.
>>
>> This was brought up during the RICH meeting this morning. The RICH
>> electronics assembly and testing occupies the same area that the SBS is
>> currently occupying. The RICH collaboration will need to start
>> assembling
>> the electronics in that area on August 2.
>>
>> Will the GEM detectors, equipment, and materials be removed by July 30?
>>
>> Regards,
>> Marc McMullen
>> Sr. Instrumentation Designer
>> Detector Support Group
>> (757) 269-7738
>
> --
> Brad Sawatzky, PhD <brads at jlab.org>  -<>-  Jefferson Lab / Hall C / C111
> Ph: 757-269-5947  -<>-  Fax: 757-269-5235  -<>- Pager: brads-page at jlab.org
> The most exciting phrase to hear in science, the one that heralds new
>   discoveries, is not "Eureka!" but "That's funny..."   -- Isaac Asimov
>
>


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_gem/attachments/20210423/ee30e90c/attachment-0001.html>


More information about the Dsg-halla_gem mailing list