[Dsg-halla_gem] [EXTERNAL] SBS gas distribution rack moved to EEL/125; help setting up?
Brad Sawatzky
brads at jlab.org
Tue Sep 21 22:51:15 EDT 2021
Hi Marc, et al,
The SBS GEM gas distribution rack was recently moved to EEL/125.
That is where the SBS GEM layers are being stored and worked on.
Marc, can your group support the GEM group in completing the setup
of that gas system so they can start flowing gas to the layers in
EEL/125? It will need to be reconnected to the network, some gas line
'jumpers' need to be run between the two sides of the rack, and lines
need to be run from the rack to the GEM modules themselves. (I believe
Jack fixed the issue with i2c multiplexing in that rack.)
I also moved a large spool of 1/4" poly into EEL/125 so fresh gas lines
can be run. General consensus is to position the rack in the most
convenient location in EEL/125 and run (relatively short) gas lines of
the needed length to the individual GEM modules. We will cut a set of
new (longer) gas lines for the final setup in the Hall in a couple
months.
I'll be out of town for about a week, but I've discussed this with John
Boyd and Anuruddha, and they are generally in either EEL/125 or /126.
-- Brad
--
Brad Sawatzky (he/him), PhD <brads at jlab.org> -<>- Jefferson Lab/ Hall C/C111
Ph: 757-269-5947 -<>- Fax: 757-269-5235 -<>- Pager: brads-page at jlab.org
The most exciting phrase to hear in science, the one that heralds new
discoveries, is not "Eureka!" but "That's funny..." -- Isaac Asimov
More information about the Dsg-halla_gem
mailing list