Hi Brad and Jack,
We talked about the space in room 125 in the GEM meeting today. DSG has started building the RICH II detector in the clean room and it would probably be best if the mixing system for the SBS was on the same side of the room as the detector and work stations. I have included a sketch of what the space should look like.
Do you see any issues with my proposed set-up?
Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_gem/attachments/20220314/86f6bae7/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: EEL 124_125 with SBS mixing system.pdf
Type: application/pdf
Size: 114693 bytes
Desc: EEL 124_125 with SBS mixing system.pdf
URL: <https://mailman.jlab.org/pipermail/dsg-halla_gem/attachments/20220314/86f6bae7/attachment-0001.pdf>
More information about the Dsg-halla_gem
mailing list