Hi Marc

Thanks for the updates.

Ching Him
________________________________
From: Marc Mcmullen <mcmullen at jlab.org>
Sent: Wednesday, August 7, 2024 4:27 PM
To: Ching Him Leung <cleung at jlab.org>; Holly Szumila-Vance via Dsg-halla_gem <dsg-halla_gem at jlab.org>
Subject: Re: Status of BB GEM gas supply relocation

Hi,

The gas flow chassis was moved last month to the SBS rack.  We have printed holding clamps for the in-line filters. The fittings for the SBS filters have arrived and will be installed.

Both the SBS and BB will have the gas filters installed at the same time since they are on the same rack now and then DSG will hook up the low pressure side detector gas lines for everything.  (Gas Flow Sensor -> Filter -> detector)

George Jacobs (DSG) will coordinate with Hall A when the SBS supply needs to be shutdown and connected via "T" fitting to supply the BB regulator. This will be done by Hall A engineering at the appropriate time.

Finally, I will move the BB monitoring cables from the old rack to the SBS rack, connect and get the monitoring started.

Regards,
Marc


Get Outlook for iOS<https://aka.ms/o0ukef>
________________________________
From: Dsg-halla_gem <dsg-halla_gem-bounces at jlab.org> on behalf of Ching Him Leung via Dsg-halla_gem <dsg-halla_gem at jlab.org>
Sent: Wednesday, August 7, 2024 4:05:09 PM
To: Holly Szumila-Vance via Dsg-halla_gem <dsg-halla_gem at jlab.org>
Subject: [Dsg-halla_gem] Status of BB GEM gas supply relocation

Hi

I would like to ask, what is the status of the BB GEM gas supply relocation?

Thank you
Ching Him
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_gem/attachments/20240807/bb08d03a/attachment.html>


More information about the Dsg-halla_gem mailing list