[dsg-halla_moller] I&C tasks status
Pablo Campero Rojas
campero at jlab.org
Fri Jun 6 14:47:35 EDT 2025
Hello Probir,
Below find the status of the tasks performed by DSG this week.
I&C Drawings
*
Modifying RTD temperature sensors wiring drawings for TM1-TM4 magnets. Adding one sensor for TM1-TM3 and three sensors for TM4; confirmation on redundant sensors for TM4 is required.
*
Started working on Voltage Taps wiring diagram modifications, after revision determined that the number of voltage taps remains the same, but one will be moved outside of vacuum vessel, and needs an additional wire
NX12 3D Model Rack
*
Estimating final location of RTD and voltage taps terminal blocks in the rack.
*
Looking the dimensions of the interlock relays.
PLC Programming
*
Rewrote PLC code to cycle through one command per magnet power supply, one supply at a time, instead of all commands per magnet power supply.
Hardware and Installation
• Epoxied 12 RTDs for six of the seven coils of TM1.
Regards,
Pablo
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_moller/attachments/20250606/bdc373a7/attachment.htm>
More information about the dsg-halla_moller
mailing list