Hello Probir,

Below find the status of the weekly tasks performed by DSG.

I&C Drawings

  *
Completed modifications for RTD temperature sensors wiring drawings for TM1-TM4 magnets. Revision in progress.
  *
Working on Voltage Taps wiring diagram modifications for TM0-TM4.

NX12 3D Model Rack

  *
Added breakers and terminal blocks for the 24 VDC power supply distribution.
  *
Added interlock panels, including relay panel and two-level terminal blocks.
  *
Relocated PLC4 to the rear side of the rack

PLC Programming

  *
Revising and testing PLC code to communicate with two magnet power supplies.
  *
Updated firmware on production PLC.



Regards,
Pablo