[Dsg-halla_magnets] SoLID magnet I&C tasks status
Pablo Campero Rojas
campero at jlab.org
Fri May 1 15:39:51 EDT 2020
Hi Steve,
DSG is making good progress on the SoLID:
* Brian has completed PLC program for the hall probe readback.
* Mary Ann and I have completed A-CAD I&C drawing A00000-16-03-1200 (find drawing here: https://www.jlab.org/physics/dsg/technical_documentation/hall_a/drawings)
* Mary Ann has generated a CSS-BOY screen for the coil radiation shield temperature.
* Aaron is developing a database for the screens.
* I am wrapping up the Cryo Reservoir HMI screen with the requested changes.
Pablo