[Dsg-halla_magnets] Turret Work Update
Brian Eng
beng at jlab.org
Thu Jul 14 13:28:36 EDT 2022
Mindy has finished adding labels to wires that needed additional labeling and has started the process of disconnecting the small flanges, which should be completed in the next day or so. See attached image for an example of after flange A was disconnected; it has been pulled through the tube (small hole on the right middle edge of the image) and additional heat shrink added over the bundle.
She's also found a few discrepancies between the drawing and how they flanges are actually wired. I'll send details later so it can be decided how to proceed once the reconnection work is done. Perhaps something to discuss in the meeting next week?
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_magnets/attachments/20220714/36362a08/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: disconnected.jpeg
Type: image/jpeg
Size: 170253 bytes
Desc: disconnected.jpeg
URL: <https://mailman.jlab.org/pipermail/dsg-halla_magnets/attachments/20220714/36362a08/attachment-0001.jpeg>
More information about the Dsg-halla_magnets
mailing list