[Dsg-halla_magnets] Turret Work Updates

Brian Eng beng at jlab.org
Thu Jul 21 17:37:47 EDT 2022


The slides from the current status has been uploaded: https://www.jlab.org/sites/default/files/dsg/talks/hall-a/2022-19.pdf

Also the documentation has been changed to reflect the as-found wiring.
Excel<https://www.jlab.org/sites/default/files/dsg/techDocs/Tech%20Specs/Turret%20Instrumentation%20Flanges%20-%202022-07-20.xlsx> and Connector PDF<https://www.jlab.org/sites/default/files/dsg/techDocs/Tech%20Specs/Turret%20Instrumentation%20Flanges%20-%202022-07-21.pdf>

Unless told otherwise we're planning on reconnecting the wiring back as it was found (even though it doesn't match the Oxford drawings).
<https://www.jlab.org/sites/default/files/dsg/techDocs/Tech%20Specs/Turret%20Instrumentation%20Flanges%20-%202022-07-21.pdf>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_magnets/attachments/20220721/44bcab36/attachment.html>


More information about the Dsg-halla_magnets mailing list