[Dsg-halla_magnets] Valve controls and monitoring checkouts

Amrit Yegneswaran yeg at jlab.org
Fri Jul 29 10:52:25 EDT 2022


great work
congratulations
________________________________
From: Dsg-halla_magnets <dsg-halla_magnets-bounces at jlab.org> on behalf of Pablo Campero Rojas <campero at jlab.org>
Sent: Friday, July 29, 2022 10:46 AM
To: dsg-halla_magnets at jlab.org <dsg-halla_magnets at jlab.org>
Subject: [Dsg-halla_magnets] Valve controls and monitoring checkouts

Hello Mindy,


All 100ft cables for the valve LVDT readouts (x9) with added jumpers were tested.

All nine cables worked as expected after swapping the wires from LVDT secondary 1 and secondary 2 to match the wiring provided from the valve LVDT side. The wiring was changed in the rack side, at the terminal strip CCR-TS-02 and TS-HX-02. There were a few ferrules that were missing connection and they were adjusted.

Drawings will be updated as well to show changes done.

Also, the all cables and wiring for the valve motors were tested, all are working as expected.

Thanks,
Pablo

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_solid/attachments/20220729/4d4b0b08/attachment-0002.html>


More information about the Dsg-halla_magnets mailing list