Yes, <span style="font-size:12pt">racks will need to be powered and be operational (including network access connection).</span>
<div style="font-size:12pt"><br>
</div>
<span style="font-size:12pt">--Pablo</span><br>
</div>
<div id="appendonsend"></div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Walt Akers <akers@jlab.org><br>
<b>Sent:</b> Wednesday, September 8, 2021 3:30 PM<br>
<b>To:</b> Pablo Campero Rojas <campero@jlab.org>; dsg-halla_magnets@jlab.org <dsg-halla_magnets@jlab.org><br>
<b>Cc:</b> Patrizia Rossi <rossi@jlab.org><br>
<b>Subject:</b> Re: Request for moving the SoLID magnet instrumentation racks</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt;">
<div class="PlainText">I'm sure we can make this work. Do they need to be powered and operational,<br>
or merely stored?<br>
<br>
Walt<br>
<br>
Pablo Campero Rojas wrote:<br>
> Hello Walt,<br>
><br>
> Did you check our request to move the SoLID magnet instrumentation <br>
> racks from TEDF (room 1544) to the Test Lab high bay area?<br>
><br>
><br>
> Regards,<br>
> Pablo<br>
> ------------------------------------------------------------------------<br>
> *From:* Pablo Campero Rojas <campero@jlab.org><br>
> *Sent:* Thursday, August 26, 2021 4:16 PM<br>
> *To:* Walt Akers <akers@jlab.org>; dsg-halla_magnets@jlab.org <br>
> <dsg-halla_magnets@jlab.org><br>
> *Cc:* Patrizia Rossi <rossi@jlab.org><br>
> *Subject:* Re: [Dsg-halla_magnets] Fw: SoLID Magnet wiring work<br>
> Hello Walt,<br>
><br>
> For the space allocations, the approximate footprint required for the <br>
> two racks is of at least 9' X 6'.<br>
> We would like to have the racks moved to the high bay area by 8/31/2021.<br>
><br>
> Regards,<br>
> Pablo<br>
><br>
><br>
> ------------------------------------------------------------------------<br>
> *From:* Dsg-halla_magnets <dsg-halla_magnets-bounces@jlab.org> on <br>
> behalf of Steven Lassiter <lassiter@jlab.org><br>
> *Sent:* Thursday, August 26, 2021 3:36 PM<br>
> *To:* dsg-halla_magnets@jlab.org <dsg-halla_magnets@jlab.org><br>
> *Cc:* Walt Akers <akers@jlab.org><br>
> *Subject:* [Dsg-halla_magnets] Fw: SoLID Magnet wiring work<br>
> Also,moving the racks into the Test Lab high bay area needs to be run <br>
> by Walt Akers for space allocation.<br>
><br>
> How much of foot print is required?<br>
><br>
> Steven<br>
><br>
><br>
> ------------------------------------------------------------------------<br>
> *From:* Steven Lassiter <lassiter@jlab.org><br>
> *Sent:* Thursday, August 26, 2021 3:31 PM<br>
> *To:* Pablo Campero Rojas <campero@jlab.org><br>
> *Subject:* Re: [Dsg-halla_magnets] SoLID Magnet wiring work<br>
> Great News.<br>
><br>
>  Hall C techs were slated to start work on the wiring but would have <br>
> to wait until the hall closes up early Sept.<br>
><br>
>  1. Wiring should be completed by third week of Sept. This gives 4<br>
>     weeks to do the wiring and then hot check out can be carried out<br>
>     while the magnet is being moved and the CCR and current service<br>
>     turret assembled to the magnet.<br>
>  2. The racks are located in tedf room 1544. This is a private room<br>
>     with floor to ceiling walls and can accommodate two people at one<br>
>     time, if not more. The room is long. Face mask is all that is<br>
>     require as there is no need for people being closer than 6 feet<br>
>     for this work. One could wear gloves is so desired.<br>
>  3. The room is locked as the room contains spare parts for HallC. If<br>
>     it needs to be moved, the Hall C techs will have to do it and that<br>
>     could be delayed until the hall  closes.<br>
>  4.  Two to three people can work on the rack in its present location.<br>
>     Two people working on a rack at the time is about as much as one<br>
>     would want to have. the third person can be in the room cutting,<br>
>     stripping and attached ferrules to the ends of the cables prior to<br>
>     installing into the racks.<br>
><br>
> thanks again<br>
> Steven<br>
><br>
> ------------------------------------------------------------------------<br>
> *From:* Dsg-halla_magnets <dsg-halla_magnets-bounces@jlab.org> on <br>
> behalf of Pablo Campero Rojas <campero@jlab.org><br>
> *Sent:* Thursday, August 26, 2021 2:48 PM<br>
> *To:* dsg-halla_magnets@jlab.org <dsg-halla_magnets@jlab.org><br>
> *Cc:* Patrizia Rossi <rossi@jlab.org><br>
> *Subject:* [Dsg-halla_magnets] SoLID Magnet wiring work<br>
><br>
> Hello Steven,<br>
><br>
><br>
> Dr. Rossi approved that DSG works on the wiring of the SoLID magnet <br>
> instrumentation in the racks.<br>
><br>
> DSG needs to schedule the wiring work so that our support for other <br>
> projects is not affected. Also, we'll need to follow all recommended <br>
> MEDCON 4 protocols and keep social distancing to minimize the risk of <br>
> exposure to COVID-19.<br>
><br>
> Can you provide the answer to the questions below?<br>
><br>
>  1. When does the racks’ wiring need to be completed?<br>
>  2. Where are the racks located?<br>
>  3. Is the access to the racks restricted?<br>
>  4. How many people will be around the rack in its present location?<br>
><br>
><br>
> DSG suggests moving the racks to the Test Lab high bay area so that <br>
> people are able to be socially distant.<br>
><br>
> DSG would like cable spools to be moved by Hall A from the physics <br>
> storage next to racks prior to the start of work.<br>