<html><body><div style="font-family: tahoma,new york,times,serif; font-size: 14pt; color: #009900"><div>marc,<br></div><div>with regards to ยง2, highlighted, after much deliberation, i am of the opinion that because of the exigent circumstances, cosmic tests and noise source debugging, replacing the underrated cable with a cable of adequate rating, was the right thing to do. however, i am concerned about the compliance of this old  system with current safety requirements. one definitely does not want to encounter hitherto unknown problems. so, notwithstanding the circumstances, the system needs to be replaced as soon as possible. </div><div><br data-mce-bogus="1"></div><div>as we discussed at the meeting today, dsg could build a safety system to replace the existing system; hall b technicians could run the new cables (if needed). </div><div><br data-mce-bogus="1"></div><div>brian, please discuss the matter with george and come up with a design; mindy will  fabricate the needed parts, which marc and george can install.  brian, george, and marc please provide a cost estimate for the new system.  <br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>amrit<br data-mce-bogus="1"></div><div><br></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Marc Mcmullen" <mcmullen@jlab.org><br><b>To: </b>"dsg-dc" <dsg-dc@jlab.org><br><b>Sent: </b>Tuesday, May 23, 2017 5:11:40 PM<br><b>Subject: </b>[Dsg-dc] DC gas safety system<br></div><div><br></div><div data-marker="__QUOTED_TEXT__">Hi Morgan,<br><br>Brian and I have replaced the 24VAC source cables which run from the <br>SFL3 gas safety system box, to the distribution box (small one with the <br>barrier blocks). We have also removed the bad barrier block from the <br>distribution and relocated the R1/2 solenoid power wires to the single <br>barrier block.<br><br><span style="background-color: rgb(255, 255, 0);" data-mce-style="background-color: #ffff00;">Brian calculated the total draw of the solenoids to be just under 6amps </span><br><span style="background-color: rgb(255, 255, 0);" data-mce-style="background-color: #ffff00;">for R1/2, the new cable p/n rates it at 15A vs. 4.9A (rating for 18awg </span><br><span style="background-color: rgb(255, 255, 0);" data-mce-style="background-color: #ffff00;">cable, which was replaced).</span><br><br>We tested the solenoids with the safety system box in local mode. All <br>were audibly verified. We left the supply flow at 0Lpm, as you requested.<br><br>Thanks,<br><br>-- <br>Marc McMullen<br>Detector Support Group<br>757-269-7738<br><br>_______________________________________________<br>Dsg-dc mailing list<br>Dsg-dc@jlab.org<br>https://mailman.jlab.org/mailman/listinfo/dsg-dc<br></div></div></body></html>