[Dsg-ft] FT Interlocks

Brian Eng beng at jlab.org
Wed Sep 7 15:44:07 EDT 2016


Since Harkirat is now back at JLab I went ahead and installed the LRZ 912 module in the FT chiller.

It still needs to be configured (i.e. what the pin functions are), but that can wait until the cRIO is here.

--
Brian Eng
Detector Support Group
757-269-6018




More information about the Dsg-ft mailing list