[Dsg-ft] cRIO installation
Amanda Hoebel
amandah at jlab.org
Tue Jul 11 13:25:31 EDT 2017
Hello,
Mindy and I installed the hardware interlocks cRIO in the hall. It is located in the rack beside the CAEN HV supply. We also connected the interlock cables for the Cal HV, Hodo HV, Hodo LV, and chiller. We could not find the Cal LV cable. Please let me know the location of the Cal LV cable and when the temperature and humidity cables are ready to be connected to the hardware interlocks.
We are still waiting on network switches in order to obtain a hall IP address for the cRIO.
Regards,
Amanda