Hi Stephan,
As mentioned in this morning teleconference, both the detectors have
complete signatures on their respective Operational Safety Procedure
documents for use in the EEL building. The EEL documents do not cover
operation in Hall B.
In addition to the OSP, JLab requires a pressure systems analysis to be
conducted for all gas systems. The initial step is the naming of a
system owner (Bob Miller) and a design authority (DA). Bob named Dave
Kashy as the DA for the MVT and FVT.
In preparation for the SVT/MVT integration and testing slated for this
summer, as well as the installation of the FT in the hall (You mentioned
July), it is important to begin the pressure systems analysis as soon as
possible. Dave Kashy will need documentation for the MVT and FVT
distribution systems in order to start the process. Per Bobs request in
the meeting, please contact him directly. Aditionally, please add
dsg-mvt at jlab.org as well as dsg-ft at jlab.org (for FT details) to those
communications so that the DSG can be informed of the status. As the DA,
Dave will inform us when we can flow gas for each respective detector.
Regards,
--
Marc McMullen
Detector Support Group
757-269-7738