    <p>dear marco,</p>
    as of now, since the schedule calls for the FT move to be in
    november, we do not want to concern ourselves with moving the FT to
    the corner.<br>
    as you point out, if for some scheduling reason the FT move is
    delayed, we may re-consider the option.<br>
    amrit<br>
    <br>
    p.s. leaving the backdoor accessible provides an independent entry
    for the  to SVT/MM and RICH.<br>
    as the MM schedule is not clear, and the video points out that the
    RICH detector could move in<i> after</i> the MM has been taken into
    the clean room for assembly, it would be prudent to keep both
    accesses available.<br>
    <br>
    <br>
    <div class="moz-cite-prefix">On 8/9/2016 6:16 AM, Marco Battaglieri
      wrote:<br>
    </div>
    <blockquote cite="mid:57A9AD90.4010402@ge.infn.it" type="cite">Dear
      Amrit and Amanda,
      <br>
      we watched Walt's video and as far as we understood, the FT area
      is not affected by the current plan. Are you sure that using the
      back door will be possible? it would mean to keep free  the
      present FT area and all the space in front of it (where RICH
      cabinets would be located, according to the video).
      <br>
      According to the existing schedule we are moving the FT to the
      Hall in November. If it is confirmed we will free the area well in
      time for the beginning of RICH assembly. If the FT move will be
      delayed, we can think of moving the FT and related equipment to
      the right side of the room in October-November when we will have
      people onsite from FT team (Genova, Saclay Edinburgh) since the
      move implies recabling everything. By the way, this would also
      imply to (re)move all the cabinets, dark box and other equpment
      currently present on the right side of the room that does not
      belong to us (Stepan?)
      <br>
      Let us know waht you think.
      <br>
      Cheers
      <br>
      Marco and Raffaella
      <br>
      <br>
      <br>
      <br>
      Amrit Yegneswaran wrote:
      <br>
      <blockquote type="cite">since we do not know when the FT will be
        moved to the hall, keeping the FT in the corner would, i guess,
        provides in addition to the access to the rear door,  a secluded
        area where one can test the system undisturbed, till it is moved
        to the hall.
        <br>
        <br>
        <br>
        On 8/8/2016 11:17 AM, Amanda Hoebel wrote:
        <br>
        <blockquote type="cite">Dear Marco,
          <br>
          <br>
          We have seen a video that Walt Akers made regarding the
          arrangement of EEL-125 for the SVT, MicroMegas, and RICH
          access to the EEL-124 clean room. The video can be found via
          this link: <a class="moz-txt-link-freetext" href="https://www.youtube.com/watch?v=W9-A36wYoIE">https://www.youtube.com/watch?v=W9-A36wYoIE</a>
          <br>
          <br>
          If we could make the back roll-up door accessible, the RICH
          could be moved and assembled independently of the SVT and
          MicroMegas. In order to make the back roll-up door accessible,
          we were wondering if the Forward Tagger could be moved to a
          different area of EEL-125, possibly where the HPS equipment is
          stored. Would it be possible to move both the HPS equipment
          and the Forward Tagger? Thanks in advance.
          <br>
          <br>
          Sincerely,
          <br>
          Amanda
          <br>
          <br>
          <br>
          _______________________________________________
          <br>
          Dsg-ft mailing list
          <br>
          <a class="moz-txt-link-abbreviated" href="mailto:Dsg-ft@jlab.org">Dsg-ft@jlab.org</a>
          <br>
          <a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-ft">https://mailman.jlab.org/mailman/listinfo/dsg-ft</a>
          <br>
          _______________________________________________
          <br>
          Dsg-internal mailing list
          <br>
          <a class="moz-txt-link-abbreviated" href="mailto:Dsg-internal@jlab.org">Dsg-internal@jlab.org</a>
          <br>
          <a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-internal">https://mailman.jlab.org/mailman/listinfo/dsg-internal</a>
          <br>
        </blockquote>
        <br>
        <br>
        _______________________________________________
        <br>
        Dsg-ft mailing list
        <br>
        <a class="moz-txt-link-abbreviated" href="mailto:Dsg-ft@jlab.org">Dsg-ft@jlab.org</a>
        <br>
        <a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-ft">https://mailman.jlab.org/mailman/listinfo/dsg-ft</a>
        <br>
      </blockquote>
      <br>
    </blockquote>
    <br>
  </body>
</html>