    <p>Hi Matt,</p>
    <p>I know you and Bob were planning to have a phone conference with
      Stephan Aune concerning the pressure systems analysis. In Georges'
      section #1 of the email attached, he refers to the Saclay
      distribution system (in bold print). Will this portion system be
      approved for gas flow upon arrival, or will there have to be an
      analysis done when it arrives. This info is critical with respect
      to the time frame of the Saclay scheduled activities/tests. DSG
      will be providing the premixed source of gas to the Saclay
      distribution, as long as the requirements have been met.</p>
    <p>Thanks,</p>
    <p>Marc<br>
    </p>
    <br>
    <div class="moz-cite-prefix">On 4/26/2017 4:09 PM, George Jacobs
      wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:f8e90c05-96bd-b599-e90d-36017d52c487@jlab.org">
      <meta http-equiv="Content-Type" content="text/html; charset=utf-8">
      There are 3 different pressure systems to look at for this. We
      should discuss them independently to avoid confusion.<br>
      <br>
      #1 --------  MVT Test Setup in EEL rm124  --------<br>
      <br>
      The 1st is the test setup for MVT in EEL rm 124. This uses
      pre-mixed cylinders of 10% C4H10 in argon gas. This is needed by
      29 May. See the attached files MVT-P&I-EEL-0404-2017.pdf (
      P&I diagram) and MVT-EEL-04-04-2017.xlsx (Components
      spreadsheet) This is needed in 30 days.<br>
      <br>
      The P&I diagram shows the test setup we plan to use. <b>There
        are unknown components contained in the box labeled MVT</b>.
      This contains the Saclay gas distribution piping, flow control,
      and of course the detector. The DA must have the details of what
      will be used. The DA requires all component information to make
      his assessment. <br>
      <br>
      #2 --------  FT Test Setup in Hall B  -------<br>
      <br>
      Once the FT tracker is installed in Hall B, it will require gas
      for testing. This test setup will supply gas from the Hall B
      target gas pad behind the counting house into the hall using
      pre-existing gas lines. This uses pre-mixed cylinders of 10% C4H10
      in argon gas. This will be needed once the FT is installed in
      July. See attached files  FT-P&I-Hall-04-04-2017-Model.pdf
      (P&I diagram) and FT-Hall-04-04-2017.xlsx (Components
      spreadsheet)<br>
      <br>
      The P&I diagram shows the test setup we plan to use. <b>There
        are unknown components contained in the box labeled FT</b>. This
      contains the Saclay gas distribution piping, flow control, and of
      course the detector. The DA must have the details of what will be
      used. The DA requires all component information to make his
      assessment. <br>
      <br>
      #3 -------  MVT Gas Mixing and Supply in 96B Gas Shed  ------<br>
      <br>
      For an overview of the mixing system, I have attached the
      powerpoint file MVT-GasMixingSystem-7-1-2016.pptx<br>
      <br>
      There are 2 gas mixtures required (1) 10% C4H10 in argon and (2)
      10% CF4 10% C4H10 in argon. The two gas mixtures will be produced
      in the gas shed by the mixing system. The gas will flow from the
      gas shed to hall B in 2 pre-existing temperature controlled lines.
      The attached files; MVT-MIXING-10-25-2016.pdf, MVT Gas Mixing
      System Operators Manual Appendix.pdf, and MVT Gas Mixing System
      Operators Manual.pdf  describe the system function and operation.
      This system will be required to be fully operational prior to 30
      Sept 2017.<br>
      <br>
      The very basic P&I diagram, MVT-MIXING-10-25-2016.pdf, shows
      all the planned system components in 96B.  The gas flows from 96b
      to the hall in 2 pre-existing 1/2" OD SS lines, ~ 300" in length.
      These lines end ~ 1/2 point of the South side of the space frame.
      From there, a 1/4" OD copper lines will connect to the MVT and FT
      gas distribution boxes, which distribute the gas to the individual
      detector locations. <b>There are unknown components contained in
        the FT and MVT gas distribution boxes that this mixing system
        supplies. </b>This contains the Saclay gas distribution piping,
      flow control, and of course the detector. The DA must have the
      details of what will be used. The DA requires all component
      information to make his assessment. <br>
      <br>
      Nothing has been purchased  for this system, no money has been
      made available. Certain items tend to have longer lead times than
      others. MKS mass flow controllers and pressure transducers may
      require up to 4-6 weeks to arrive. Time must be allocated for
      pressure system evaluation, pressure test planning, OSP writing
      process, leak checking, and pressure testing. The system should be
      completely assembled no later than 30 Aug in order for testing to
      be completed by 30 Sept. All components should be in hand by 15
      July.<br>
      <br>
      The critical path includes the following;<br>
      •Purchase Components<br>
      •Fabricate and Install Gas Shed Valve Panel<br>
      •Fabricate and Install scales and regulators for the C4H10 and CF4
      Cylinders<br>
      •Fabricate and Install Controls Chassis and Cables<br>
      •Run tubing in Gas Shed to Connect Valve Panel to Temperature
      Controlled lines to Hall B<br>
      •Run tubing in Hall B to Connect Temperature Controlled lines to
      the MVT and FT Gas Panels<br>
      •Develop cRio Controls<br>
      •Test cRio Controls<br>
      •Test with Saclay and FT Gas Distribution Systems<br>
      <br>
      <br>
      <br>
      <div class="moz-cite-prefix">On 4/26/2017 9:18 AM, Amrit
        Yegneswaran wrote:<br>
      </div>
      <blockquote type="cite"
        cite="mid:608359539.1369579.1493212734231.JavaMail.zimbra@jlab.org">
        <div style="font-family: tahoma,new york,times,serif; font-size:
          14pt; color: #009900">
          <div>so marc,<br>
          </div>
          <div>you are implying that <em>all needed components must be
              in hand by 6/15 to be ready for the 10/17 run.</em><br
              data-mce-bogus="1">
          </div>
          <div>so, guessing that the lead time to procure typical
            (usual, common, and reasonable) components is about 2 weeks,
            the DA should finish his initial analysis by 5/31.<br
              data-mce-bogus="1">
          </div>
          <div><br data-mce-bogus="1">
          </div>
          <div>DA initial analysis must finish by <strong><span
                data-mce-style="color: #ff0000;" style="color: rgb(255,
                0, 0);">5/31.</span></strong><br data-mce-bogus="1">
          </div>
          <div>procure components <strong><span data-mce-style="color:
                #ff0000;" style="color: rgb(255, 0, 0);">6/1---6/15</span></strong><br
              data-mce-bogus="1">
          </div>
          <div>fabricate, install and test <strong><span
                data-mce-style="color: #ff0000;" style="color: rgb(255,
                0, 0);">6/16-- 10/15</span></strong><br
              data-mce-bogus="1">
          </div>
          <div><strong><span data-mce-style="color: #ff0000;"
                style="color: rgb(255, 0, 0);"><br data-mce-bogus="1">
              </span></strong></div>
          <div><span data-mce-style="color: #000000;" style="color:
              rgb(0, 0, 0);">could george and you please improve upon
              the time line, and e-mail the groups.</span></div>
          <div><span data-mce-style="color: #000000;" style="color:
              rgb(0, 0, 0);">amrit </span></div>
          <div><span data-mce-style="color: #ff0000;" style="color:
              rgb(255, 0, 0);"><br data-mce-bogus="1">
            </span></div>
          <div><span data-mce-style="color: #000000;" style="color:
              rgb(0, 0, 0);"><br data-mce-bogus="1">
            </span></div>
          <div><br>
          </div>
          <hr id="zwchr" data-marker="__DIVIDER__">
          <div data-marker="__HEADERS__"><b>From: </b>"Marc Mcmullen" <a
              class="moz-txt-link-rfc2396E"
              href="mailto:mcmullen@jlab.org" moz-do-not-send="true"><mcmullen@jlab.org></a><br>
            <b>To: </b><a class="moz-txt-link-abbreviated"
              href="mailto:dsg-mvt@jlab.org" moz-do-not-send="true">dsg-mvt@jlab.org</a>,
            <a class="moz-txt-link-abbreviated"
              href="mailto:dsg-ft@jlab.org" moz-do-not-send="true">dsg-ft@jlab.org</a>,
            "Volker Burkert" <a class="moz-txt-link-rfc2396E"
              href="mailto:burkert@jlab.org" moz-do-not-send="true"><burkert@jlab.org></a>,
            "Bob Miller" <a class="moz-txt-link-rfc2396E"
              href="mailto:rmiller@jlab.org" moz-do-not-send="true"><rmiller@jlab.org></a>,
            "Mac Mestayer" <a class="moz-txt-link-rfc2396E"
              href="mailto:mestayer@jlab.org" moz-do-not-send="true"><mestayer@jlab.org></a>,
            "Maxime Defurne" <a class="moz-txt-link-rfc2396E"
              href="mailto:mdefurne@jlab.org" moz-do-not-send="true"><mdefurne@jlab.org></a><br>
            <b>Cc: </b>"Patrizia Rossi" <a
              class="moz-txt-link-rfc2396E" href="mailto:rossi@jlab.org"
              moz-do-not-send="true"><rossi@jlab.org></a><br>
            <b>Sent: </b>Wednesday, April 26, 2017 9:02:21 AM<br>
            <b>Subject: </b>[Dsg-mvt] Emailing - Requirements to
            complete gas service for the MVT to CLAS12.pdf<br>
          </div>
          <div><br>
          </div>
          <div data-marker="__QUOTED_TEXT__">Good Morning,<br>
            <br>
            Attached are the requirements to complete the gas service
            for the MVT to <br>
            operate in Hall B. Additionally, preliminary cost estimates
            for the gas <br>
            system and controls have been attached.<br>
            <br>
            Regards,<br>
            <br>
            <br>
            -- <br>
            Marc McMullen<br>
            Detector Support Group<br>
            757-269-7738<br>
            <br>
            <br>
            _______________________________________________<br>
            Dsg-mvt mailing list<br>
            <a class="moz-txt-link-abbreviated"
              href="mailto:Dsg-mvt@jlab.org" moz-do-not-send="true">Dsg-mvt@jlab.org</a><br>
            <a class="moz-txt-link-freetext"
              href="https://mailman.jlab.org/mailman/listinfo/dsg-mvt"
              moz-do-not-send="true">https://mailman.jlab.org/mailman/listinfo/dsg-mvt</a><br>
          </div>
        </div>
        <br>
        <fieldset class="mimeAttachmentHeader"></fieldset>
        <br>
        <pre wrap="">_______________________________________________
Dsg-mvt mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Dsg-mvt@jlab.org" moz-do-not-send="true">Dsg-mvt@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-mvt" moz-do-not-send="true">https://mailman.jlab.org/mailman/listinfo/dsg-mvt</a>
</pre>
      </blockquote>
      <br>
      <pre class="moz-signature" cols="72">-- 
George Jacobs
Jefferson Lab (TJNAF)
STE 12
12000 Jefferson Ave.
Newport News, VA 23606

(office) 757-269-7115

(cell)   757-876-0480

(email) <a class="moz-txt-link-abbreviated" href="mailto:jacobsg@jlab.org" moz-do-not-send="true">jacobsg@jlab.org</a>

(website) <a class="moz-txt-link-freetext" href="https://userweb.jlab.org/%7Ejacobsg" moz-do-not-send="true">https://userweb.jlab.org/~jacobsg</a></pre>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Dsg-mvt mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Dsg-mvt@jlab.org">Dsg-mvt@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-mvt">https://mailman.jlab.org/mailman/listinfo/dsg-mvt</a></pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
Marc McMullen
Detector Support Group
757-269-7738</pre>