Hi Bob,
I can meet with you later this week, maybe Friday morning, to discuss the gas system. I'll use the meeting scheduler to find an available time.
Marc
________________________________
From: Bob Miller <rmiller at jlab.org>
Sent: Thursday, November 30, 2023 1:30 PM
To: Marc Mcmullen <mcmullen at jlab.org>
Cc: Brian Eng <beng at jlab.org>
Subject: Re: Bonus Gas System Changes for ALERT Experiment
Hey Marc,
Please find attached the information for the mods to the Bonus gas system so it can be used for ALERT.
Let me know when you can meet to discuss the details.
Thanks,
Bob
On 11/30/2023 1:25 PM, Brian Eng wrote:
Hi Bob,
Marc will be handling the controls for this system.
Hopefully we can reuse a lot of the existing BONUS stuff.
On Nov 27, 2023, at 3:10 PM, Bob Miller <rmiller at jlab.org><mailto:rmiller at jlab.org> wrote:
Hi Brian,
I have a conceptual design of the ALERT gas system that I would like to review with the controls person. Do you know who that will be?
Thanks,
Bob
On 11/3/2023 8:52 AM, Bob Miller wrote:
Hi Brian,
The ALERT group will set up their detector in the EEL as early as February, they did not seem to have a firm date.
Most of the Bonus gas system and controls will be reused. The changes are to control the pressure in the detector using the mixed gas. We will add a small buffer tank after the detector with a PT and a TT, and a control valve after the tank to control the pressure at 1050 mbar, based on the PT. In order to provide a pressure differential across the valve, we will add a surge tank with a PT, control valve, and pump to maintain the surge tank at 800-900 mbar.
I will work on an updated P&ID for ALERT.
Thanks,
Bob
On 11/2/2023 5:25 PM, Brian Eng wrote:
I'll need to talk with Amrit about who would actually do the work.
Do you have a general idea of the changes involved and when they need to be done?
________________________________
From: Bob Miller <rmiller at jlab.org><mailto:rmiller at jlab.org>
Sent: Thursday, November 2, 2023 4:46 PM
To: Brian Eng <beng at jlab.org><mailto:beng at jlab.org>
Subject: Re: Bonus Gas System Changes for ALERT Experiment
Thanks,
Who should I work with for the detector gas control changes?
-Bob
On 11/2/2023 4:30 PM, Brian Eng wrote:
> For sure I did the target, not sure if I also did the detector gas or if Marc worked on that part.
>
> That cRIO is still down in the hall and AFAIK running.
>
> For the hardware I think George started it and Morgan (or someone else from Hall B Engineering) took over it once it went to the hall.
>
>> On Nov 2, 2023, at 4:12 PM, Bob Miller <rmiller at jlab.org><mailto:rmiller at jlab.org> wrote:
>>
>> Hi Brian,
>>
>> Do you remember who did the controls for Bonus? I need to make some hardware and control changes to use this system for ALERT and would like to know who to work with.
>>
>> Thanks,
>>
>> Bob
>>
>> --
>> Bob Miller
>> Hall B Lead Engineer
>> Jefferson Lab
>> 757 822-9586
>> <B00000-01-19-PD01-Rev B.pdf>
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_gas/attachments/20231206/3ddd8839/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: ALERT Gas System Nov 2023.pdf
Type: application/pdf
Size: 381811 bytes
Desc: ALERT Gas System Nov 2023.pdf
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_gas/attachments/20231206/3ddd8839/attachment-0001.pdf>
More information about the dsg-hallb_gas
mailing list