Hi Bob,
I would expect the Alicat MFCs to arrive somewhere near the end of March, we will keep an eye on the progress.
In the meanwhile, we will proceed with the test stand controls and make adjustments as needed, depending if the new MFCs are available or not.
By next week I will have a cRIO setup in 125 and move the Bonus supply MFC to the EEL subnet for testing.
Thanks,
Marc
Get Outlook for iOS<https://aka.ms/o0ukef>
________________________________
From: Bob Miller <rmiller at jlab.org>
Sent: Thursday, March 7, 2024 7:15:34 AM
To: Marc Mcmullen via dsg-hallb_gas <dsg-hallb_gas at jlab.org>; Marc Mcmullen <mcmullen at jlab.org>
Subject: Re: 2024-02-21 DSG-Hall B ALERT meeting
Hi Marc,
I met with Gabriel from the ALERT run group yesterday. He will be at JLab to operate the detector with the gas system on April 10th.
If the MFCs do not arrive in time, we would like to run with the Bonus supply MFC that is already on the gas panel. The pressure can be controlled by the bubbler until the new system is operational. I have designed new bubblers and will have them installed by the end of the month.
Thanks,
Bob
________________________________
From: dsg-hallb_gas <dsg-hallb_gas-bounces at jlab.org> on behalf of Marc Mcmullen via dsg-hallb_gas <dsg-hallb_gas at jlab.org>
Sent: Friday, February 23, 2024 5:23 PM
To: Marc Mcmullen via dsg-hallb_gas <dsg-hallb_gas at jlab.org>
Subject: [dsg-hallb_gas] 2024-02-21 DSG-Hall B ALERT meeting
Hi,
DSG met with Hall B engineering to discuss the progress of the project. The minutes from that meeting can be reviewed at the following link.
2024-02-21 DSG-Hall B ALERT meeting<https://www.jlab.org/sites/default/files/dsg/minutes/Hall%20B%20gas/2024-02-21%20post.pdf>
Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_gas/attachments/20240307/593bc384/attachment.html>
More information about the dsg-hallb_gas
mailing list