Hi Morgan,

Brian and I were working on connecting the mass flow controllers this morning. Those should be online once Sergey and Brian have a look at the switch on the cart.

As far as the cables are concerned, there are 3 solenoid coils and two pressure transducer cables in the short cable tray (see attached) that leads over to the cart that need to be pulled over. There will also need to be two other 3 pair cables, one we are making with enough length to pull from L1-19 to the cart. The other is just a 3 pair which will not need any modification.

If your group can pull over the 3 solenoid coil and connectors for PT110 and PT406 (all in the short cable tray near the beam line), we will modify the one 3 pair and give you the second 3 pair to be run sometime tomorrow.

Marc



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_gas/attachments/20241113/c8e75338/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: cables in tray.jpg
Type: image/jpeg
Size: 249498 bytes
Desc: cables in tray.jpg
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_gas/attachments/20241113/c8e75338/attachment-0001.jpg>


More information about the dsg-hallb_gas mailing list