[dsg-hallb_htcc] HTCC Move pre-job brief minutes
Marc Mcmullen
mcmullen at jlab.org
Tue Dec 6 07:29:42 EST 2022
Hi Youri,
DSG conducted a pre-job brief with the HTCC detector manager and the Hall B work coordinator to discuss the detector instrumentation disconnection/re-connection during the upcoming move from the beam-line location to the Hall floor.
The minutes from that meeting can be viewed at this link:
HTCC Move Pre-Job Brief<https://www.jlab.org/sites/default/files/dsg/minutes/Hall%20B%20gas/HTCC%20Move%20pre-job%20brief_post.pdf>
Additional information on DSG gas flow monitoring systems can be found at the following links:
Hall A Gas Distribution and Monitoring System for the GEM Detectors<https://www.jlab.org/sites/default/files/dsg/techDocs/Talks/Gas%20Distribution%20and%20Monitoring%20System%20for%20the%20GEM%20detectors_final.pdf>
The Gas Flow Monitoring System for the Hall A BigBite Spectrometer’s GEM Detectors<https://www.jlab.org/div_dept/physics_division/dsg/notes/2021-12.pdf>
Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_htcc/attachments/20221206/905787a8/attachment.html>
More information about the dsg-hallb_htcc