<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<style type="text/css" style="display:none;"><!-- P {margin-top:0;margin-bottom:0;} --></style>
</head>
<body dir="ltr">
<div id="divtagdefaultwrapper" style="font-size:12pt;color:#000000;font-family:Calibri,Helvetica,sans-serif;" dir="ltr">
<p style="margin-top:0;margin-bottom:0">Hi Marc,</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">The HTCC gas panel (attached to the detector) is equipped with  corresponding Rotameter which is normally closed.</p>
<p style="margin-top:0;margin-bottom:0">The Rotameter is installed in parallel with Mass Flow Controller  In case if there is a power outage in the hall this Rotameter
<br>
</p>
<p style="margin-top:0;margin-bottom:0">has to be open and set to gas flow rate of about 10 l/min. All this has been successfully tested. System experts are responsible</p>
<p style="margin-top:0;margin-bottom:0">to take all necessary steps regarding HTCC<span> "of mitigating the effects of a massive power outage". I agree with your<span> suggestion 
<br>
</span></span></p>
<p style="margin-top:0;margin-bottom:0"><span><span>"running the HTCC purge using a Rotameter during the holidays". As Morgan has proposed recently we will switch from CO2
<br>
</span></span></p>
<p style="margin-top:0;margin-bottom:0"><span><span>to dry Air after completion of physics run this year and then switch back to  dry CO2 (days before start of next physics run in 2019).</span></span></p>
<p style="margin-top:0;margin-bottom:0"><span><span>Thank you for bringing attention to the important aspect.
<br>
</span></span></p>
<p style="margin-top:0;margin-bottom:0"><span><span><br>
</span></span></p>
<p style="margin-top:0;margin-bottom:0"><span><span>Youri  </span></span><span></span><br>
</p>
</div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Dsg-htcc <dsg-htcc-bounces@jlab.org> on behalf of Marc Mcmullen <mcmullen@jlab.org><br>
<b>Sent:</b> Tuesday, December 11, 2018 3:29:37 PM<br>
<b>To:</b> dsg-htcc@jlab.org; Morgan Cook IV; Denny Insley<br>
<b>Subject:</b> [Dsg-htcc] Back Up Power for Hall B Gas Controls</font>
<div> </div>
</div>
<style type="text/css" style="display:none">
<!--
p
        {margin-top:0;
        margin-bottom:0}
-->
</style>
<div dir="ltr">
<div id="x_divtagdefaultwrapper" dir="ltr" style="font-size:12pt; color:#000000; font-family:Calibri,Helvetica,sans-serif">
<p style="margin-top:0; margin-bottom:0">Hi Denny,</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Yesterday I disconnected the SFL3 Gas Controls from an extension cord and reconnected it to the local utility power outlet. The Gas Controls equipment is on a UPS however that is only meant to last long enough for on-call
 staff to get on site. <br>
</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">The HTCC is a critical system which would suffer during an outage of substantial time. In the past, I believe the gas supply has been switched over to bypass the MFC in the case of an outage. I am not sure if the bypass
 circuit is still in service. This is the most efficient method of mitigating the effects of a massive power outage. I strongly suggest running the HTCC purge using a Rotameter during the holidays.
<br>
</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Additionally, it might be a good idea to run an electrical circuit which is connected to generator back-up  to the gas controls on SFL3, FC deck 0, and maybe even the Gas Shed control room.
<br>
</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Regards,</p>
<p style="margin-top:0; margin-bottom:0">Marc<br>
</p>
</div>
</div>
</body>
</html>