[Dsg-ltcc] Gas Controls Status
Marc McMullen
mcmullen at jlab.org
Wed Nov 29 16:59:06 EST 2017
The status of the Hall B Gas Controls are as follows:
DC - The mixing system and regional supplies are running. Specified flow
levels to the detectors should be determined and adjusted. Morgan and
Denny have been trained on adjusting the flow.
HTCC - The system has been moved to the Hall B Gas Controls, and is
running. Youri S. and Will P. have been trained on adjusting the
flow.*FYI, the cRIO and TEDF controls chassis will be removed by C.O.B.*
MVT - The gas controls are running in Automatic Flow Control mode. Once
flow to the MFC is started and a demand flow signal is generated by the
Saclay MVT PLC system, flow should start. This system will still need
some functionality testing with gas (Next Week, providing there is gas
service from the target gas pad). Maxime and Yuri G. are have been
trained to adjust the balance of gas using the Hall B Gas Controls.
LTCC - all connected sectors are flowing gas.
SVT - The MFC was not installed, nitrogen is being supplied by a rotometer.
Marc McMullen
Physics Division
Detector Support Group
7738
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-ltcc/attachments/20171129/4a7619e7/attachment.html>
More information about the Dsg-ltcc
mailing list