[Dsg-ltcc] LTCC Leak Sealing Meeting
Marc McMullen
mcmullen at jlab.org
Thu Apr 19 15:24:35 EDT 2018
*Attendance*: B. Miller, D. Insley, D. Anderson, M. Ungaro, B. Eng, M.
McMullen, G. Jacobs, T. Lemon, A. Hoebel, P. Campero
Discussion on current leak rates for the LTCC sectors which have gas
flow, and how ambient pressure affects the sectors.
Hall B will start sealing sector 1 next week. After sealing on the
floor, they will hook up gas and DSG will measure the leak rate on the
floor, before the detector is reinstalled. After installation, DSG will
monitor the leak rates.
This will repeat until all available sectors (except 4, which has been
dismantled) are completed.
There was discussion on the purchase of C4F10, George provide costs and
lead times. There has not been a final determination of gas procurement
from management.
Discussions on a distillation/recovery system is on-going, within Hall
B/Physics Management.
--
Marc McMullen
Detector Support Group
757-269-7738
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-ltcc/attachments/20180419/2d27d1c1/attachment-0001.html>
More information about the Dsg-ltcc
mailing list