Hi George,

The bubbler location looks adequate to protect the detector.  I will 
check the location in the Hall and we can discuss oil level. The 
detector will see 1.5 inches of water of head from the lowest point of 
the detector to its highest point.

Thanks,

Bob

822-9586


On 1/22/2018 12:17 PM, George Jacobs wrote:
> Hi Bob,
>
> I have installed an overpressure protection bubbler for LTCC S5 at the 
> original location on the Fwd Carriage. The installed height is 
> actually below the S5 detector volume, but this is the original 
> location of the bubblers. This addition should not have any effect on 
> the test.  See attached diagram.
>
> Thanks,
> George
> -- 
> George Jacobs
> Jefferson Lab (TJNAF)
> STE 12
> 12000 Jefferson Ave.
> Newport News, VA 23606
>
> (office) 757-269-7115
>
> (cell)   757-876-0480
>
> (email)jacobsg at jlab.org
>
> (website)https://userweb.jlab.org/~jacobsg

-- 
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 269-7867

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_ltcc/attachments/20180122/6973cb13/attachment-0002.html>


More information about the Dsg-ltcc mailing list