[Dsg-ltcc] [Dsg-internal] LTCC and C4F10 PO
Amrit Yegneswaran
yeg at jlab.org
Fri Jul 20 09:02:11 EDT 2018
thanks marc.
it appears that S2 is a 100% worse, while S3 is doing good (is 3S topped off with c4f10?)
do you know if the re-circulation system will be ready by the time the new batch of gas arrives?
per george the c4f10 should arrive in 6-8 wks, i.e. end of sept. 2018.
amrit
From: "Marc Mcmullen" <mcmullen at jlab.org>
To: "dsg-internal" <dsg-internal at jlab.org>
Sent: Friday, July 20, 2018 8:39:58 AM
Subject: Re: [Dsg-internal] LTCC and C4F10 PO
I fixed the formatting. Sector 2 is the only one with gas flow.
On 7/19/2018 5:36 PM, Marc McMullen wrote:
Hi Amrit,
The C4F10 PO says it was ordered on 7/9. Please see attachment.
Additionally, I have added the LTCC sector flow averages since S2 and 3 were reinstalled. We can go over the numbers tomorrow.
LTCC Sectors daily average since 07/13/18
1 3.18 uninstalled
2 82.76 N2
3 4.26 C4F10
4 1.54 uninstalled
5 0.00 uninstalled
6 16.25 uninstalled
--
Marc McMullen
Detector Support Group
757-269-7738
_______________________________________________
Dsg-internal mailing list Dsg-internal at jlab.org https://mailman.jlab.org/mailman/listinfo/dsg-internal
--
Marc McMullen
Detector Support Group
757-269-7738
_______________________________________________
Dsg-internal mailing list
Dsg-internal at jlab.org
https://mailman.jlab.org/mailman/listinfo/dsg-internal
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-ltcc/attachments/20180720/8d9de0bd/attachment.html>
More information about the Dsg-ltcc
mailing list