[Dsg-ltcc] LTCC Testing
Brian Eng
beng at jlab.org
Mon May 14 10:24:25 EDT 2018
Marc and I moved the electronics for the test setup to the ESB.
Let us know when you're available to make the gas connections. We'll need to zero the MFC & DP sensor prior to starting.
I'm also waiting for the CC to finalize the networking, right now the port isn't working yet.
> On May 11, 2018, at 5:27 PM, Brian Eng <beng at jlab.org> wrote:
>
> Since the new deliver date for the magnehelic is the 26th (I think Dwyer sat on the order and just now processed it) we're going to switch to an MKS 223 sensor.
>
> The setup is done in EEL so we'll transfer it over to the ESB on Monday.
>
> I'll let you guys handle the gas connections.
> We have an inlet to the MFC, outlet from a solenoid and a differential pressure transducer that needs connecting.
>
> All the data will be saved locally to the cRIO, but there is an Omega to handle when the solenoid opens/closes so it should be easy to see what is going on and make changes.
>
>> On May 9, 2018, at 3:26 PM, Brian Eng <beng at jlab.org> wrote:
>>
>> I'm still waiting on the differential pressure transmitter, the delivery date was supposed to be the 30th so I've asked the buyer to look into it.
>>
>> It'll be a day or so after getting that to setup the equipment for the test.
>