[Dsg-ltcc] [New Logentry] LTCC gas controls

mcmullen at jlab.org mcmullen at jlab.org
Fri Oct 26 17:05:01 EDT 2018


Logentry Text:
--
The LTCC gas mfc controls were halted, most likely due to reinstallation of the mass flow controller onto the return line. The controls have been restored. All alarms for sectors 1,2,4,and 6 are disabled, flow and pressure alarms for sectors 3 and 5 are enabled.

---