Hi Brian,

Yesterday we supplied hall b with two differential pressure sensors. Back in 2018 the old sensors were removed from the system setup (mks) in sectors 3 &5. We need two additional Dwyer for a total of 4 to complete the system.

Marc[image/jpeg]
Twin Dwyer sensors setup for sector 3.
________________________________
From: dsg-hallb_ltcc <dsg-hallb_ltcc-bounces at jlab.org> on behalf of Brian Eng <beng at jlab.org>
Sent: Tuesday, May 17, 2022 9:34 AM
To: Bob Miller <rmiller at jlab.org>
Cc: dsg-hallb_ltcc at jlab.org <dsg-hallb_ltcc at jlab.org>
Subject: Re: [dsg-hallb_ltcc] Install the other 2 LTCC detectors

Yes. From what I recall off-hand each bubbler has 2 pressure readings, one for the new pressure transmitter (that were delivered yesterday) and another for the existing pressure sensor (that goes to the magnehelic and omega units).

Marc can verify when he arrives to start the chassis work for the new sensors.
________________________________
From: Bob Miller <rmiller at jlab.org>
Sent: Tuesday, May 17, 2022 8:06 AM
To: Brian Eng <beng at jlab.org>
Subject: Re: [dsg-hallb_ltcc] Install the other 2 LTCC detectors

Hi Brian,

I will connect the sensors and run the cables.  Sectors 3 and 5 have 2
pressure sensors at each bubbler, are you going to set up sectors 2 and
6 the same way?

Thanks

Bob


On 5/16/2022 3:59 PM, Brian Eng wrote:
> Hi Bob,
>
> I put two differential pressure sensors (but no ferrules on the swagelok fitting) and 200' of cable over near the LTCC rack on the FC. Just let me know when the cables are ready to be terminated.
>
> Marc will check (and probably need to rewire) the chassis starting tomorrow. This will include some periods of downtime while power is removed. Since it's my understand the sectors still have N2 this shouldn't be any issue.
>
> Code is already in good shape to handle these sensors, so I don't see any issues on that front.
>
>> On May 13, 2022, at 3:03 PM, Brian Eng <beng at jlab.org> wrote:
>>
>> We'll see what sensors and instrumentation is available on Monday.
>>
>> Since Marc worked on a lot of that code I'll have him help when he's available on upgrading to the newer setup as well.
>>
>> The only conflict will be that making sure the RICH construction isn't slowed down any while the INFN collaborators are here as that is currently DSG's highest priority. Based on their schedule we should be okay.
>>
>> From: Bob Miller <rmiller at jlab.org>
>> Sent: Friday, May 13, 2022 2:49 PM
>> To: Brian Eng <beng at jlab.org>
>> Subject: Install the other 2 LTCC detectors
>>
>> Hi Brian,
>>
>> Hall B has been tasked with installing the other 2 LTCCs this month to
>> use for run group C.  This was a late request from the run group and
>> Patrizia would like the detectors installed.
>>
>> For sectors 3 and 5, a few years ago, we updated the gas system with 2
>> pressure sensors at each bubbler.
>>
>> We need to do the same update for sectors 6 and 2, as well as test the
>> system for these sectors.
>>
>> Can you check the system to see what is required to cable the new
>> sensors and update it?
>>
>> I can install the bubblers and pressure transducers.
>>
>> The run starts on June 8th, so I would like to have the tests completed
>> by May 29th, so I can fill the detectors May 30th.
>>
>> Thanks
>>
>> Bob
>>
>> --
>> Bob Miller
>> Hall B Lead Engineer
>> Jefferson Lab
>> 757 822-9586
>>
>> _______________________________________________
>> dsg-hallb_ltcc mailing list
>> dsg-hallb_ltcc at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/dsg-hallb_ltcc

--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_ltcc/attachments/20220517/6d06b98f/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: DB1F8631-9F72-43BD-ABA2-9488A18D2997.jpeg
Type: image/jpeg
Size: 2118834 bytes
Desc: DB1F8631-9F72-43BD-ABA2-9488A18D2997.jpeg
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_ltcc/attachments/20220517/6d06b98f/attachment-0001.jpeg>


More information about the dsg-hallb_ltcc mailing list