<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
We'll see what sensors and instrumentation is available on Monday.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Since Marc worked on a lot of that code I'll have him help when he's available on upgrading to the newer setup as well.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
The only conflict will be that making sure the RICH construction isn't slowed down any while the INFN collaborators are here as that is currently DSG's highest priority. Based on their schedule we should be okay.</div>
<div id="appendonsend"></div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" color="#000000" style="font-size:11pt"><b>From:</b> Bob Miller <rmiller@jlab.org><br>
<b>Sent:</b> Friday, May 13, 2022 2:49 PM<br>
<b>To:</b> Brian Eng <beng@jlab.org><br>
<b>Subject:</b> Install the other 2 LTCC detectors</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt">
<div class="PlainText">Hi Brian,<br>
<br>
Hall B has been tasked with installing the other 2 LTCCs this month to <br>
use for run group C. This was a late request from the run group and <br>
Patrizia would like the detectors installed.<br>
<br>
For sectors 3 and 5, a few years ago, we updated the gas system with 2 <br>
pressure sensors at each bubbler.<br>
<br>
We need to do the same update for sectors 6 and 2, as well as test the <br>
system for these sectors.<br>
<br>
Can you check the system to see what is required to cable the new <br>
sensors and update it?<br>
<br>
I can install the bubblers and pressure transducers.<br>
<br>
The run starts on June 8th, so I would like to have the tests completed <br>
by May 29th, so I can fill the detectors May 30th.<br>
<br>
Thanks<br>
<br>
Bob<br>
<br>
-- <br>
Bob Miller<br>
Hall B Lead Engineer<br>
Jefferson Lab<br>
757 822-9586<br>
<br>
</div>
</span></font></div>
</body>
</html>