[Dsg-hallb_magnets] [New Logentry] Follow-up Re: Complete P027	Pre-power-up Interlock Checklist
    beng at jlab.org 
    beng at jlab.org
       
    Tue Sep 26 08:55:02 EDT 2017
    
    
  
Logentry Text:
--
With approval from Ruben, Pablo and I did the abbreviated checkout procedure, which is the same as was done prior to KPP.
Probir and Nick did the interlock testing for the QDs and comparator in parallel with their QD verification.
---