Both FastDAQ cRIOs have been upgraded to 2018. Additional the data recording was started for both.
Version changes
Solenoid
FW: 5.2.0f0 to 6.0.0f1
OS: NI Linux Real-Time x64 4.6.7-rt14-5.2.0f0 to NI Linux Real-Time x64 4.9.47-rt37-6.0.0f1
Torus
FW: 4.0.0f0 to 6.0.0f1
OS: NI Linux Real-Time ARMv7-A 4.6.7-rt14-ni-5.2.0f0 to NI Linux Real-Time ARMv7-A 4.9.47-rt37-ni-6.0.0f1
Those were all done via the NI MAX software,here's what was done manually for both.
OPKG Setup (to use proxy)
vi /etc/opkg/opkg.conf
add: option http_proxy http://jprox.jlab.org:8080
Install NTP
opkg update
opkg install ntp ntp-utls
vi /etc/ntp.conf
add: server ntp#.jlab.org (# = 1-4)
Enable core dumps
vi /etc/init.d/lvrt-wrapper
uncomment out: ulimit -c unlimited (line 25)
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3576263
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20180525/260026ce/attachment.html>
More information about the Dsg-hallb_magnets
mailing list